Rolling back a release
Rollback follows the same procedure as deployment, including MCR node notification and success/failure messaging.
For the rollback procedure, refer to Rolling back a release.
If the rollback is successful, you get a <release version> was successfully rolled back from Test message. If unsuccessful, the screen returns an error notification at the bottom right of the screen.