Taboola walkthrough
Taboola API version 1 is currently supported
Connection
To connect the TaboolaKlaviyo API v2024-02-15 API with your destination, refer to Taboola connection. After creating a connection, use this connection to generate reports.
Predefined reports
Data Integration provides a convenient entry point and recommended approach for accessing a range of predefined reports. Each report includes a concise data description, a list of customizable fields (if applicable), and the schema mapping.
Since these reports follow a standardized format, specific fields are locked and can only be accessed through Custom reports.
Custom reports
Select a specific report to pull data from the Klaviyo API v2024-02-15 API. The following shows the list of various custom reports:
- Revenue Summary
- Visit Value
- Recirculation Summary
- Campaign Summary
- Accounts
- Campaigns
- Conversation Rules
- Top Campaign Content
- Video Campaign Summary
- Video Campaigns
- Video Creatives
- Video Campaign Creatives Breakdown For more information, refer to Taboola documentation.
For each report in Data Integration, you can view either an "Advertiser Report" or a "Publisher Report".
Generating a report
- Navigate to the Data Integration Account.
- Select the connection that you created.
- Select the accounts of the report. Leave this field empty to pull results for all available accounts.
- Select the dimension to pull.
- Part of the reports support two types of time periods:
-
Date Range
-
Pulls data in the date range between the start and end date provided, including the end date.
-
You must select a Start Date.
-
The Start Date does not advance if a River run is unsuccessful.
-
If you want to turn off this default setting, click More Options and select the checkbox to advance the start date even if the River run is unsuccessful (Not recommended).

-
Leaving the End Date empty pulls data according to the current time of the river's run.
-
Select a timezone offset to send dates considering the offset.
-
Use the Last Days Back For Each Run to expand the start date and pull data a given number of days back before the chosen start date.
-
-
Predefined date - A date range defined by Data Integration:
- Day - Yesterday.
- Week (From Monday to Sunday) - Week to date, Previous week, Previous week to date.
- Month - Month to date, Previous month, Previous month to date.
- Year - Year to date.
-
Interval Chunks
Data Integration can run over the increment using chunks to make the loading efficient and precise. You can choose from:
- Don't Split: Data Integration pulls the data from the chosen start date to the end date in one bulk.
- Daily: The run is chunked daily from the start to the end date.
- Monthly: The run is chunked monthly from the start to the end date.
- Yearly (Less Recommended): The run is chunked yearly from the start to the end date.