Skip to main content
Feedback

Nuviad walkthrough

Pulling data from Nuviad in Data Integration

You can data from your Nuviad account into Data Integration.

Procedure

  1. Navigate to the Data Integration Console.

  2. Select the Nuviad connection. Change it or create a new one.

  3. Select the required report from the list of reports.

  4. Select the time period of the report:

    a. Enter the start date.

    b. Enter the end date.

    c. Days back: specify the Days back field to pull data from a given number of days before the start date.

  5. Select the time zone for the report. The Default time zone is UTC.

  6. Select segments for the report. Leaving the segments section empty retrieves raw data. Choosing any segment groups the results according to the selected segment, showing only cost, impression, date, and possible segments.

On this Page