Mavenlink walkthrough
Prerequisites
Mavenlink reports
Mavenlink reports are grouped into several endpoints, such as project-based and custom field–based reports.
All reports are time-dependent and include multiple filters. Mavenlink lets you filter data using any of the available time fields in each report.
You can configure all time-dependent reports using Data Integration built-in time features.
Time-dependent Reports
Select a time period: Time-dependent reports support two kinds of time periods:
- Date range:
- Pulls data in the date range between the start and end date provided, including the end date.
- You must select a start date.
- Leaving the end date empty pulls data based on the current river's run time.
- Select a timezone offset to send dates based on the offset.
- Use the Last Days Back For Each Run to expand the start date and pull data a number of days back before the chosen start date.
- Predefined date - A date range defined by Data Integration:
- Day: Yesterday.
- Week (From Monday to Sunday): Week to date, Previous week, Previous week to date.
- Month: Month to date, Previous month, Previous month to date.