Skip to main content
Feedback

Criteo version 2024-7 walkthrough

Prerequisites

Criteo Connection.

Criteo reports in Data Integration

Step 1: Select the connection

  • Choose the appropriate “Criteo” connection from the available list in the Source tab of the River.
  • If the desired connection does not exist, create or update an existing connection.

Step 2: Choose reports

  • Choose a report from the Report drop-down menu.
  • Reports Filters: Filter the report by Advertisers (leave this filter empty to get the report for all Advertisers):

Campaigns performance report

  • Reports Columns: Select the report's metrics, dimensions, and currency.
note

Some metric/dimension combinations would not work. An error message appears when you attempt to run unsupported combinations.

Step 3: Select Report time period

Select the time period of the report.

All the reports support two kinds of time periods:

  • Date range:

    • Pulls data in the date range between the start and end date provided, including the end date.
    • You must select a start date.
    • Leaving the end date empty pulls data according to the current time of the river's run.
    • Select a timezone offset to send dates considering the offset.
    • Use the Last Days Back For Each Run to expand the start date and pull data a given number of days back before the chosen start date.
  • Predefined date: A date range defined by Data Integration:

    • Day: Yesterday.
    • Week (From Monday to Sunday): Week to date, Previous week, Previous week to date.
    • Month: Month to date, Previous month, Previous month to date.
    • Year: Year to date.

Step 4: Choose Interval chunks

Data Integration can run over the increment using chunks to make the loading efficient and precise. You can choose from:

  • Don't Split: Data Integration pulls the data from the chosen start date to the end date in one bulk.
  • Daily: The run is chunked daily from the start to the end date.
  • Monthly: The run is chunked monthly from the start to the end date.
  • Yearly (less recommended): The run is chunked yearly from the start to the end date.

Interval Size: Set the size of each interval. For example, setting the Interval Size to 4 with a Daily Interval Chunk splits the date period into 4-day chunks. The period from January 1, 2020, to January 8, 2020, will be split into two intervals: from January 1, 2020, to January 4, 2020, and from January 5, 2020, to January 8, 2020.

On this Page