Skip to main content
Feedback

BlueSnap walkthrough

Prerequisite

A valid BlueSnap connection must be established in Data Integration.

Pull data from BlueSnap using Data Integration

Report selection

  • Select the specific report you want to pull from BlueSnap.

Configuring the report time period

You can configure the report to pull data for a specific time period. BlueSnap reports in Data Integration supports two types of time periods:

  1. Date range:

    • Pulls data between a start date and end date, including the end date.
    • A start date is mandatory.
    • Leaving the end date empty pulls data up to the current river running time.
    • You can set a timezone offset to adjust the time period for your specific time zone.
    • Use the Last Days Back For Each Run option to backfill data by pulling from a specified number of days before the chosen start date.
  2. Predefined date range:

Alternatively, you can use predefined date ranges offered by Data Integration:

  • Day: Yesterday
  • Week: Week to date, Previous week, Previous week to date (Monday to Sunday)
  • Month: Month to date, Previous month, Previous month to date
  • Year: Year to date
On this Page