RVR-BSFEEDER-103
Issue summary
- The error message
Start value {start_date} must be less or equal to End value {end_date} Error Code: RVR-BSFEEDER-103occurs when there is a configuration issue in a data pipeline using the Data Integration platform. This error indicates that the specified start date is greater than the end date, which is not a valid configuration for date ranges in data extraction or data processing activities.
Action steps
To resolve the error, follow these steps:
- Review the date settings in your Data Integration data source or data process configuration to ensure the start date is not greater than the end date. You can typically edit in the Data Integration console.
- If you use placeholders or variables for dates, double-check their actual values during execution to ensure they contain the correct data.
- Consider using more flexible date settings like a predefined range (e.g., "Previous Month", "Year to Date") if applicable.
note
If the issue persists or you need help, open a case with Data Integration Support. In the console sidebar, select Help > Contact Us and follow the instructions.