Skip to main content
Feedback

RVR-SAPC-506

Issue summary

  • The error "MISSING_START_DATE_OR_END_DATE" with Error Code: RVR-SAPC-506 indicates that either the start date or the end date is not provided in the configuration for the Data Connector 'sapconcur'. This happens because at least one of these fields is mandatory for data extraction. This start and end date setup is important as it specifies the period for which the data is to retrieve.

Action steps

To resolve the error, follow these steps:

  • Check Configuration: Ensure that both the start date and the end date you specify in your Data Integration configuration for the sap-concur data connector.
  • Specify Dates: If your data extraction targets a specific period, explicitly set both the start and end dates in the format DD/MM/YYYY.
  • Empty End Date: If you want the data to pull up to the time of the Data Flow run, ensure to leave the end date empty, as Data Integration will automatically fetch data up to the current time when executed.
  • Review Timezone: Check the timezone configuration when date discrepancies occur and ensure all dates use UTC for accurate data extraction.
  • Date Format Compliance: Ensure the date format used in the configuration matches the required format (DD/MM/YYYY).
  • Incremental Extraction: If you are using incremental data extraction methods, ensure that all required configurations like start date/value are properly set as they are essential in defining data retrieval intervals.

External references

note

If the issue persists or you need help, open a case with Data Integration Support. In the console sidebar, select Help > Contact Us and follow the instructions.

On this Page