Skip to main content
Feedback

RVR-FB-111

Issue summary

  • The error code RVR-FB-111 associated with "DATES_VALIDATION" indicates a date-related issue with the Facebook data connector in Data Integration. This is likely due to incorrect or missing date parameters in your data pull request.
  • In many instances involving date validation errors, the start and/or end dates could be incorrectly formatted, not set properly, or missing.

Action steps

To resolve the error, follow these steps:

  • Ensure Valid Dates: Make sure that both the start and end dates you specify are correctly formatted. The start date is mandatory, and if you omit the end date, the data will fetch up to the current time of the Data Flow's run.
  • Date Timezone: Confirm the dates are in the correct timezone, typically UTC, as this is the standard for many API integrations.
  • Review Incremental Settings: Use the "Last Days Back For Each Run" option to adjust your date range capture if necessary.
  • Re-Test After Changes: After making necessary corrections to the date configurations, run the test connection in Data Integration to verify the settings and ensure no further errors.

External references

note

If the issue persists or you need help, open a case with Data Integration Support. In the console sidebar, select Help > Contact Us and follow the instructions.

On this Page