Skip to main content
Feedback

RVR-FB-111

  1. Issue Summary

    • The error code RVR-FB-111 associated with "DATES_VALIDATION" indicates a date-related issue with the Facebook data connector in Data Integration. This is likely due to incorrect or missing date parameters in your data pull request.
    • In many instances involving date validation errors, the start and/or end dates could be incorrectly formatted, not set properly, or missing.
  2. Action Steps:

    • Ensure Valid Dates: Make sure that both the start and end dates are specified and correctly formatted. The start date is mandatory, and if the end date is omitted, the data will be fetched up to the current time of the river's run.
    • Date Timezone: Confirm the dates are in the correct timezone, typically UTC, as this is the standard for many API integrations.
    • Review Incremental Settings: Use the "Last Days Back For Each Run" option to adjust your date range capture if necessary.
    • Re-Test After Adjustments: After making necessary adjustments to the date configurations, run the test connection in Data Integration to verify the settings and ensure no further errors.
  3. External References:

If the issue persists or you need further assistance, please open a ticket with Data Integration support.