Skip to main content
Feedback

RVR-CPA-201

Issue summary

The error message "The specified date interval is not valid" with error code RVR-CPA-201 relates to the Coupa data connector on Data Integration. This error arises when the specified date range for the data retrieval is incorrect or not supported by the Coupa API or Data Integration settings. Common issues include the start date after the end date, the date range is too large, or using incompatible date formats.

Action steps

To resolve the error, follow these steps:

  1. Check Date Range: Ensure that the start date is before the end date and both are correct.
  2. Format Validation: Check that the date format is compliant with the expected format (typically YYYY-MM-DD).
  3. Incremental Loading: If using incremental loading, verify the settings and that the end date of one run properly aligns to the start of the next.
  4. Consult Coupa Restrictions: Review any API limits or restrictions on the date range retrieved in one call from Coupa's API documentation.
  5. Data Integration Settings: Check Data Integration configuration for any specific date range settings or constraints applicable to Coupa. Data Integration supports time periods and predefined date ranges.
  6. Adjust Timezone: Ensure the date and time settings are correct, considering any timezone differences (Data Integration typically uses UTC).

External references

For more information on configuring date ranges in Data Integration, refer to the Data Integration Coupa Connection topics, related the Coupa connector and setting date intervals.

note

If the issue persists or you need help, open a case with Data Integration Support. In the console sidebar, select Help > Contact Us and follow the instructions.

On this Page