RVR-APPSFLYER-203
Issue summary
The error code RVR-APPSFLYER-203 with the description "Request is missing start date" indicates that a required start date parameter has not been specified for the data extraction task using the AppsFlyer Data Connector in Data Integration.
Action steps
To resolve this issue, follow these steps:
- Verify the start date: Confirm that the Start Date is specified in your AppsFlyer data connector configuration. This field is mandatory when setting up date ranges for data extraction tasks.
- Validate date formatting: Ensure that the date follows the required format for the data connector. Review the configuration settings to confirm the input date is correct.
- Check date range parameters: If you use a predefined date range or interval, such as Last Days Back For Each Run, verify that all required parameters related to start date parameters are correctly configured.
External references
For more details on setting up the AppsFlyer data connector, refer to the Data Integration documentation on AppsFlyer topic.
note
If the issue persists or you need further assistance, open a support case with Data Integration Support. In the console sidebar, select Help > Contact Us and follow the instructions.