RVR-APPSFLYER-203
-
Issue Summary
- The error message "Request is missing start date Error Code: RVR-APPSFLYER-203" indicates that a required
start dateparameter has not been specified for the data extraction task using the AppsFlyer Data Connector in Data Integration. According to Data Integration documentation, specifying a start date is mandatory when setting up date ranges for data extraction tasks.
- The error message "Request is missing start date Error Code: RVR-APPSFLYER-203" indicates that a required
-
Action Steps:
- Verify that the
start dateis specified in your Data Integration configuration for the AppsFlyer data connector. - Ensure that the date is provided in the correct format as required by the data connector. Double-check the configuration settings to confirm the input date is properly set.
- If using a predefined date range or interval (e.g., "Last Days Back For Each Run"), ensure that all required parameters related to start dates are correctly configured.
- Verify that the
-
External References:
- For more details on setting up the AppsFlyer data connector, you can refer to the Data Integration Documentation on AppsFlyer.
If the issue persists or you need further assistance, please open a ticket with Data Integration support.