Skip to main content
Feedback

RVR-ANA-200

Issue summary

The error code RVR-ANA-200 with the description "Task changed status" indicates that an Anaplan task transitioned to an unexpected state during execution. This typically occurs due to connectivity interruptions, configuration discrepancies, or integration setup issues within Data Integration.

Action steps

To resolve this issue, follow these steps:

  1. Verify the Anaplan connection: Confirm that your connection to Anaplan is active. Ensure the credentials and settings match the requirements in the Anaplan environment.
  2. Check task status in Anaplan: Log in to Anaplan and review the task status that Data Integration attempted to execute. Identify any errors or warnings displayed in Anaplan's interface.
  3. Validate task configuration: Ensure the task configuration in Data Integration aligns with the intended Anaplan operations. Verify that input and output data structures match the expected formats.
  4. Check logs: Examine the logs in Data Integration for detailed error messages or status codes that provide additional context for the state transition.
  5. Retry execution: After confirming all configurations are accurate and the connection is stable, rerun the task.
note

If the issue persists or you need further assistance, open a ticket with Data Integration support.